First-Ever 1200 Acre Nuclear-Powered Data Centre To Host BTC Mining By CoinEdition

[ad_1]

© Reuters. First-Ever 1200 Acre Nuclear-Powered Data Centre To Host BTC Mining
  • Cumulus Data has finished constructing the first nuclear-powered data center in Susquehanna.
  • The campus will power mining and cloud computing services.
  • The data center supports strong zero-carbon ESG client benefits in addition to scalability, flexibility, and time-to-market advantages

Talen Energy’s subsidiary Cumulus Data reported that the first-of-its-kind nuclear-powered data center based out of Susquehanna, Pennsylvania is finally complete and ready to provide cloud computing services.

The firm announced that significant construction milestones for Phase 1 of the campus’s flagship 475-megawatt zero-carbon Susquehanna data center had been reached. Its first 48-megawatt, 300,000-square-foot data center has a powered shell that is finished, available for leasing, and has many fiber routes in operation.

The data center will facilitate Bitcoin mining and cloud computing services via collaboration with US-based bitcoin mining company TeraWulf. To build the Nautilus Cryptomine on campus, Talen announced a partnership with TeraWulf in 2021. Recently TeraWulf shared an update, stating that it w …

The post First-Ever 1200 Acre Nuclear-Powered Data Centre To Host BTC Mining appeared first on Coin Edition.

See original on CoinEdition

[ad_2]

Source link

© Reuters. First-Ever 1200 Acre Nuclear-Powered Data Centre To Host BTC Mining
  • Cumulus Data has finished constructing the first nuclear-powered data center in Susquehanna.
  • The campus will power mining and cloud computing services.
  • The data center supports strong zero-carbon ESG client benefits in addition to scalability, flexibility, and time-to-market advantages

Talen Energy’s subsidiary Cumulus Data reported that the first-of-its-kind nuclear-powered data center based out of Susquehanna, Pennsylvania is finally complete and ready to provide cloud computing services.

The firm announced that significant construction milestones for Phase 1 of the campus’s flagship 475-megawatt zero-carbon Susquehanna data center had been reached. Its first 48-megawatt, 300,000-square-foot data center has a powered shell that is finished, available for leasing, and has many fiber routes in operation.

The data center will facilitate Bitcoin mining and cloud computing services via collaboration with US-based bitcoin mining company TeraWulf. To build the Nautilus Cryptomine on campus, Talen announced a partnership with TeraWulf in 2021. Recently TeraWulf shared an update, stating that it w …

The post First-Ever 1200 Acre Nuclear-Powered Data Centre To Host BTC Mining appeared first on Coin Edition.

See original on CoinEdition

Add a Comment

Your email address will not be published. Required fields are marked *